- EfW (Energy from Waste plant)
- Entire piping module built off-site in 3 days by a 2 man crew, and delivered to the project complete with piping system ready to lift onto roof mechanical room – access and hot works permit problems to fabricate this installation on site
- No welded joints in main steelwork frame (to house secondary piping frames). System entirely demount-able, removable and reusable if required during the service life without waste of any steelwork components (life-cycle cost advantages).